DEARTO-Professional manufacturer of temperature and humidity measuring instruments
Tai'an Detu Automation Instrument Co., Ltd.

0538-5089056

News Current position:Home > News

Thermal Knowledge | ?Second-class standard platinum resistance thermometers for calibration by the fixed-point method

Release time:2024-6-25    This article is read 4578 Times

Second-class standard platinum resistance thermometers are calibrated by first-class platinum resistance thermometer standard devices using the fixed-point method. The so-called fixed-point method, that is, the thermometer to be examined were placed in the water three-phase point, tin solidification point and zinc solidification point, measuring its resistance value, and then the results of the test and the last cycle of the test results, and then determine whether its stability meets the requirements.


1. The composition of the first-class platinum resistance thermometer standard device

① Standard device: a group of first-class standard platinum resistance thermometer, three, model WZPB-1.

② Calibration equipment: DC comparison ritual temperature bridge, the basic error 1 × 10-6R + 10 △ R (1Ω ≤ R ≤ 1000Ω), model QJ58; water three-phase point bottle and its insulation device; tin point furnace and its temperature control device, metal purity (by weight) of 99.999%; zinc point furnace and its temperature control device, metal purity (by weight) of 99.999%; platinum resistance furnace and its temperature control device. Temperature control device, in the placement of the temperature sensing element in the 100mm range of the axial maximum temperature difference does not exceed 1K.


2. Generation of three fixed points

2.1 Generation of water three-phase point

2.1.1 Water three-phase point

Water three-phase point temperature is a pressure of 610.615Pa in a sealed container, ice, water and saturated steam between the three-phase equilibrium temperature, which defines the value of +0.01 ℃ (273.16K), water, a phase equilibrium diagram shown in Figure 1. three-phase point of the water is not subject to the influence of atmospheric pressure, it is made out of the temperature can be maintained in a few months in the 0.1mK within the same.

圖片 1.png

Fig.1 An equilibrium diagram of water

2.1.2 Generation and preservation of water three-phase points

①Pre-cooling: before freezing, put the bottle of three-phase point in the thermos flask with crushed ice and water to pre-cool overnight, so that its temperature drops to about 1℃.

②Freezing: use cotton dipped in alcohol to scrub the thermometer insertion well of the three-phase point bottle clean, and no water should be left in the well. Repeatedly with cotton dipped in liquid nitrogen in the plug well to pull, so that the plug well around the formation of ice sets. At the beginning of the cotton less, pull the amplitude is small, try to make the bottom of the plug well around the first ice. To be thick enough ice (about 8mm), more cotton, pulling amplitude can be larger, so that the ice layer gradually lengthened, thickened. Ice thickness of 10mm can be. Freezing process should pay special attention to prevent the water three-phase point bottle liquid surface icing. Once the ice can be covered by hand, so that the ice melting.

③ Preservation: The water triple-phase point bottle is placed in a thermos bottle containing ice and water for preservation, the water at the bottom of the bottle is drained every day, crushed ice is added, and the mouth of the bottle is covered with an insulating material.

Water three-phase point bottle frozen after the first few hours, due to the growth of ice crystals or strain within the measured water three-phase point temperature rises faster, about a day and night after stabilization before use.


2.2 Generation of Tin Freezing Point

2.2.1 Metal cooling curve and thermopanel

In order to achieve the solidification point of the metal, the metal is generally first fully melted and then cooled down cooling curve (i.e., temperature and time relationship curve) is shown in Figure 2. which ABD part of the uniform liquid phase cooling process; horizontal part of the EC is the equilibrium phase transition process, at this time the temperature of the material is unchanged, the temperature on the line of the EC is the solidification temperature of the material; EC this period of time is the temperature of the time of the panel: BDE part of the equilibrium phase transition is said to have a supercooling phenomenon before BDE part that in the equilibrium phase transition before the phenomenon of subcooling, once the beginning of a large number of crystallization, the system temperature that is to return to the normal solidification point, the thermopanel appeared; CF part of the crystallization is completed, is a solid-phase cooling process.

圖片 2.png

Fig. 2 Metal cooling curve

2.2.2 Generation of the solidification point of tin

High purity tin solidifies with a large degree of subcooling (up to 20-30°C). In order to obtain a good temperature ping, must use a slow solidification called "external crystallization nucleation" of the induction technology, the specific operation process is as follows:

① Preparation: the tin point furnace and control cabinet connected to confirm the correct wiring; connected to the gas pipe and install a flow meter on top of it; will monitor the thermocouple into the tin point furnace thermometer inserted in the well, the thermocouple connected to the digital multimeter.

② Temperature control: thermostat given the value of 1.005mV, 60-segment programmable temperature controller curve in Figure 3, the actual value of the thermostat is 1.005mV plus a certain moment of the program given the value of the instrument. Figure 4 for the tin point furnace heating curve.

圖片 3.png

Fig.3 Programmable Temperature Controller Curve for Tin Point Furnace

圖片 4.png

Fig.4 Tin spot furnace heating curve

First 60-segment programmable temperature controller to go to the AB section in Figure 3, so that the tin is completely melted, the maximum temperature at the time of melting is about 20K higher than the solidification point of tin. Then 60 programmable temperature controllers go to Figure 3 in the BCD section, the furnace temperature control than the solidification point of tin 2-3K, maintained for 10min, during which the temperature change should not exceed 0.2K. Then 60 programmable temperature controllers go to Figure 3 in the DE section, so that the molten tin at a rate of 0.15K/min temperature reduction. When monitoring the value of the thermocouple down to the tin solidification point near (high 0.1K or so), start blowing nitrogen, nitrogen volume flow rate of about 15L/min. closely observe the value of the thermocouple, when it suddenly stops dropping and quickly back up, immediately stop blowing (blowing time of about 10min), observing the value of the thermocouple, to be back up to the temperature of the solidification point of tin near the thermocouple, remove the thermocouple, and then special stainless steel inducer bar Insert the special stainless steel inducing rod into the well, induced 1min after removal. At this time, the tin solidification point temperature ping appeared, the temperature is 231.928 ℃. Furnace temperature control than the solidification point of low 2K or so. Warm ping time of about 2h.


2.3 Generation of zinc solidification point

① Preparation: the zinc point furnace and control cabinet connected to confirm that the wiring is correct; will monitor the thermocouple into the zinc point furnace thermometer insert wells, thermocouple connected to a digital multimeter.

② Temperature control: thermostat given the value of 2.00mV, 60-segment programmable temperature controller curve in Figure 5, the actual value of the thermostat is 2.00mV plus a certain moment of the program given the value of the instrument.

圖片 5.png

Fig.5 Programmable temperature controller curve for zinc point furnace

First 60-segment programmable temperature controller to go to the AB section in Figure 5, so that the zinc is completely melted, the maximum temperature at the time of melting than the zinc solidification point of about 20K higher. Then 60 programmable temperature controllers go to Figure 5 in the BCD section, the furnace temperature control than the zinc solidification point of 2 ~ 3K, maintained for 10min, during which the temperature change should not exceed 0.2K. Then 60 programmable temperature controllers go to Figure 5 in the DE section, so that the molten zinc at a rate of 0.15K/min temperature reduction. When the monitoring thermocouple value stops falling and begins to rise, remove the thermocouple, the quartz tube induced rod inserted into the plug well, induced 1min and then removed. At this time the zinc solidification point temperature ping appeared. The temperature is 419.527℃, and the furnace temperature is controlled at about 2K lower than the solidification point. The thermopanel time was about 3.5h.


3. The second class standard platinum resistance thermometer checking

3.1 Test principle

Determination principle block diagram in Figure 6.

 

3.2 A second standard platinum resistance thermometer calibration steps

① water three-phase point generation: 24h before the test water three-phase point generation and save.

② Annealing: temperature sensing element for the quartz cross skeleton of the thermometer, the verification should be in the upper limit of the temperature 630 ℃ annealing 2h.

③ Measurement WSn: According to 2.2.2 to establish the tin solidification point temperature ping, measuring the inspected second-class standard platinum resistance thermometer RSn (platinum resistance thermometer into the tin point furnace, should be placed in the annealing furnace before preheating). Measurement of RSn and then put the thermometer indoors to cool down, measure the thermometer Rtp (measurement before the three-phase point of the bottle inside the melt, that is, in the three-phase point of the bottle insert well filled with water slightly higher than 0 ℃, rotate the bottle, so that the ice jacket rotation), the measurement results will be filled into the record table.

④ Measurement of WZn: Establish the zinc solidification point temperature ping according to 2.3, and measure the RZn of the inspected second-class standard platinum resistance thermometer (the platinum resistance thermometer should be placed in the annealing furnace to preheat before it is put into the zinc point furnace). Measure RZn and then put the thermometer in the room to cool down, and then measure the Rtp of the thermometer. fill in the measurement results in the record table.

⑤ Organize the test results: fill in the "second-class standard platinum resistance thermometer comprehensive results of the table", out of the certificate of verification, verification cycle of 2 years.


3.3 Precautions for calibration of a second standard platinum resistance thermometer

3.3.1 Temperature correction

QJ58 DC comparison ceremony temperature bridge measurement, and the bridge supporting the DC standard resistance must be immersed in transformer oil to maintain the resistance of the ambient temperature remains unchanged. QJ58 each time the readings are completed, you must measure the DC standard resistance of the ambient temperature, in order to do the platinum resistance of the measured value of the temperature correction.


3.3.2 Judging the availability of measured values

During the calibration of platinum resistance thermometers, a variety of judgments need to be made about various measurements to determine the availability of the measured values.


3.3.3 Avoiding external influences on the QJ58 bridge

Due to the high sensitivity of the photoelectric amplifiers fitted to the QJ58 bridge, a slight vibration or fluctuation in supply voltage will cause the detector pointer to wobble violently, making it impossible to read and easily damaging the bridge. Therefore, the location of the current detector should not be vibration, to avoid the use of the bridge in the period of supply voltage fluctuations may be large. If the detector pointer is found to be shaking violently or drastically, it should be stopped immediately.


Thermal Knowledge | ?Second-class standard platinum resistance thermometers for calibration by the fixed-point method
  • Online message

  • Your name
    Your title must be filled
  • Cellphone number
    Mobile phone number is required
  • whatsapp/wechat
    Optional
  • Type of consultation
    Required, please select the type of consultation
  • Consultation content
    Required, what is the content you want to consult?
  • Verification code: Please fill in the calculation result.
Previous:News | DEARTO New Invention Patent Certificate and Computer Software Copyright Registration Certificatenext:Lanterns Reflect Our Original Aspiration · Precision Ensures Reunion | DEARTO Wishes You a Peaceful Lantern Festival

Contact us

DEARTO QR codeHeadquarter Address Tai'an High-tech Development Zone,  Shandong Province 
Telephon :+86 0538-5089056  +86 13953856217 
Fax : +86 0538-5059718 
After sale:+86 0538-5050959
Website : www.tadt.com.cn 
E-mail   :  tadtzdh@dearto.cn

Copyright? Tai'an Detu Automation Instrument Co., Ltd.             Lu ICP 14024757-1           Business license inquiry

主站蜘蛛池模板: 永久福利视频| 不卡av免费看| 欧美丝袜脚交| 亚洲v| 欧美日皮视频| 国产精品黄色av| 免费啪啪小视频| www.av在线.com| 色女人网站| 色香五月| 九九色网站| 欧美亚洲欧美| 欧美日韩一区二区在线| 大学生av| 日韩欧美另类在线| 成年人网站免费| 免费黄色影视网站| 欧美日韩在线免费看| 亚洲成人网在线| 亚洲一卡二卡在线| 九九热伊人| 99精品免费在线观看| 羞羞网站在线看| 国产中文视频| hd最新国产人妖ts视频| 久操免费观看| 日日噜噜噜| 亲子伦一区二区三区观看方式| 草久在线观看视频| 久久精品一日日躁夜夜躁| 狠狠艹| 亚洲精品国产精品国产| 欧美××××黑人××性爽| 亚洲九九夜夜| 美腿丝袜亚洲色图| 亚洲美女视频在线| 日韩精品在线视频| 久久精品韩国| 久久久久久久久久一级| 日本高清色本在线观看| 绯色av一区二区| 久久精品不卡| 国产激情网| 亚洲黄色一区二区三区| 欧美黄色一级片视频| 黄色在线观看av| 韩日视频一区| 黄色裸体18| 这里只有精品在线播放| 欧美日韩精品一二三区| 欧美日韩一卡二卡| 亚洲爽爽| 精品一区二区成人免费视频| 日韩欧美a级v片免费播放| 欧美日韩免费视频| 最新中文字幕免费视频| 日本精品久久久久久久| 制服丝袜日韩在线| 91caoporn在线| 中文亚洲av片在线观看| 精品人妻一区二区三区四区在线| 国产福利毛片| 国产91精品ai换脸| 性色av浪潮av| 欧美一级免费在线| 国产一区二区三区免费看| 亚洲乱子伦| 超碰蜜桃| 精品中文在线| 中文字幕在线影院| 免费观看黄网站| 黄网在线播放| 思思在线精品| 日韩天堂网| 精品久久久久久久久久| 人人看人人澡| 6080啪啪| 青草福利视频| 毛片com| 天天操免费视频| 先锋资源一区| 打白嫩美女屁股视频| 国产在线一二三| 在线91观看| 内射毛片内射国产夫妻| 欧美v日韩| 香蕉av在线播放| 亚洲综合精品一区| 26uuu噜噜一噜噜| 精品人妻伦九区久久aaa片| 国产亚洲精品av| 四虎影视永久地址www成人| 九九热欧美| 亚洲黄色第一页| 这里只有精品视频在线| 97在线播放| 亚洲丝袜色图| 曰本理伦片午夜理伦片| 国产午夜美女| 娇妻被交换粗又大又硬毛片| 国产成人综合欧美精品久久| 国产精品乱轮| 美美女高清毛片视频免费观看| 国产不卡二区| av不卡观看| 在线看免费| 黄色小视频免费观看| 欧美成人69| 9l视频自拍蝌蚪9l视频成人| 特淫毛片| 青草青视频| 久久中文精品| 国产成人专区| 欧美在线天堂| 国产精品地址| 精品免费成人| 日本美女日批视频| 国产小精品| 久久久久久黄色片| 激情综合久久| 亚洲天堂网视频| 中文日韩字幕| 一级性生活毛片| 三区在线| 青娱乐国产| 日韩簧片| 五十路息子| 法国空姐电影在线| 日韩美女国产精品| 中文字幕第一区| av色在线播放| 999视频| 国产视频一区二区在线播放| 中文字幕一区二区三区在线不卡| 久久精品这里有| 精品久久久视频| 亚洲成人黄色| 在线免费精品| 国产第一页视频| 久久青草精品一区二区三区| 日韩av成人在线观看| 在线超碰| 精品国产成人亚洲午夜福利| 亚洲第一天堂| 500部大龄熟乱视频| 国产视频导航| 夜射av| 免费黄网站在线观看| 午夜亚洲视频| 中文一区二区三区在线观看| 欧美日韩v| 久综合| 女人张开腿让男人插| 亚洲第一成人在线| 亚洲天堂网视频| 国产微拍精品一区| 日本国产亚洲| 婷婷色激情| 国产一国产二| 密臀久久| 国产仑乱无码内谢| 一级性生活毛片| 亚洲欧洲免费| 一级日韩片| 美女上床网站| 欧美综合一区二区三区| 亚欧综合在线| 午夜精品久久久久久久传媒| www.日韩精品| 黄色网址你懂的| 国产黑丝一区| 中文字幕日韩一区二区三区| 欧美aa大片| 免费欧美大片| 特级少妇| 特黄一毛二片一毛片| 久久午夜精品| 伊人天堂av无码av日韩av| 爱爱视频久久| 一级在线视频| 99热在线看| 午夜两性| 日韩成人三级| 亚洲美女视频一区二区| 国产一区网站| av字幕在线| 在线视频自拍| 密臀av| 日韩大片免费观看视频播放| www.久久久久久久久| 欧美网站在线| 高潮一区二区三区| www.欧美国产| 永久久久久久| 欧美黄视频网站| xxxxxbbbbb| 久久精品一日日躁夜夜躁| 成人网页| 老司机av福利| 国产区在线视频| 亚洲一级片av| 黄色大片中文字幕| 国产愉拍| 国产精品视频第一页| 亚洲成人av在线播放| 国内av在线| 不戴套各种姿势啪啪高素质| 久一视频在线观看| 欧美日性视频| 亚洲欧洲免费视频| 国产精品无码免费播放| 久久久久国产一区二区三区潘金莲| www久久久久久| 欧美日韩蜜桃| 成人性视频免费网站| 捆绑调教在线观看| 色小妹av| 特级做a爱片免费69| 中文字幕日产乱码中文字幕| 亚洲男人皇宫| 一区二区三区四区免费观看| 51亚洲精品| 麻豆毛片| 色导航在线| 久久开心网| 亚洲一级片免费看| 丝瓜色版| 怡红院男人的天堂| 久久午夜视频| 亚洲情网| 色开心| 亚洲国产精品综合| 四虎永久网站| 成人国产免费| 麻豆一级视频| 三级黄色在线| 1024国产在线| 蜜臀av中文字幕| 国产精品熟妇人妻g奶一区| 99资源总站| 92av视频在线观看| 欧美无极品| 亚洲综合干| 日本午夜视频| 青青精品| 国产99视频在线观看| 女性裸体瑜伽无遮挡| 可以免费看av| 亚洲国产www| 都市激情自拍| 伊人手机在线| 国产成人综合电影| 国产精品18| 久久久最新网址| 日本一区视频免费看| 超碰加勒比| 欧美精产国品一二三区| 爱爱福利社| 我要色综合网| 日韩免费看片| 又紧又大又爽精品一区二区| 日韩免费一区二区| 91久久久久久亚洲精品蜜桃| av动漫在线免费观看| 男人的天堂va| 自拍三区| 久爱国产| 国产视频第三页| av永久免费| 国产精品毛片无遮挡| 瑟瑟视频在线免费观看| 鲁一鲁一鲁一鲁一av| 性猛少妇对白xxxxx富婆| 黄色在线免费网站| 男人亚洲天堂| 欧美黄色一级视频| 60分钟| 国产夫妻自拍av| 亚洲tv在线观看| 男女性生活视频网站| 国产精品xxxx国产| 又粗又硬做爰特爽视频| 91视频网| 中文字幕观看| 亚洲黄色录像片| 色吊丝网站| 免费的日本网站| sese一区| 国产天堂av| 97国产在线观看| 好吊妞视频一区二区三区| 日韩伦乱| 99资源总站| 久操中文字幕在线观看| 亚洲一区毛片| www.com久久| 免费高清成人| 中文字幕在线观看网站| av电影久久| 成人免费毛片日本片视频| 色综合天天综合网国产成人网| 国产精选一区二区| 亚洲三区av| 亚洲成人诱惑| 精品一区免费| 日韩av线| 91麻豆精品| 中国女人毛茸茸| 韩日在线| 日本一区不卡在线观看| 中文字幕mv| 午夜涩涩| 免费播放黄色片| 懂爱av| 久久久精品综合| 97精品一区二区| 久久久无码人妻精品无码| 亚洲最大黄色网址| 国产aⅴ| 亚洲欧美另类综合| 啪啪福利视频| 美女超碰| 国产夫妻久久| 国模福利视频| 宅男视频污| 午夜视频在线观看网站| www四虎| 日韩一级片| jlzzjlzz欧美大全| 欧美黑人一级片| 亚洲国产私拍精品国模在线观看| 久久久成人免费电影| 天天操天天曰| 欧美一区二区免费视频| 亚洲精品推荐| 麻豆av网| 狠狠干夜夜干| 五月婷婷亚洲| 久热伊人| 白浆在线| a天堂视频在线| 日本精品www| 调教一区二区| 日韩中文字幕在线视频| 天天综合久久综合| 激情综合久久| 中文在线国产| 国产日韩欧美视频| 男女高h视频| 久久毛片| 午夜伦理久久| 成人h动漫精品一区二区器材| 亚洲日本综合| 亚洲熟悉妇女xxx妇女av| 国产日韩免费在线观看| 亚洲 国产 日韩在线 精品| 亚洲国产成人av| www.久久伊人| 欧美变态绿帽cuckold| 99精品视频在线观看免费| 国产偷亚洲偷欧美偷精品| 丁香婷婷久久| 国产精品99久久久精品无码| 伊人网五月天| 高清国产mv在线观看| 亚洲热在线| 94国产精品| 日韩精品播放| 欧美一线高本道| 91在线精品观看| 青青草久久久| 浪浪视频污| 黄www片| 国际av在线| 欧美在线一区视频| 毛片网页| 亚洲精品久久久| 99国产精品免费| 粉嫩小箩莉奶水四溅在线观看| 国产精品99久久久久的智能播放| 操亚洲女人| 国产做受高潮| 五月综合视频| 麻豆黄色网| av黄色在线播放| 国产高清视频免费在线观看| 亚洲三级久久| 成人av影视在线| 四虎性| 综合网在线观看| www.91操| 美女成人在线| 五月天婷婷网站| 精品国产69| 91高潮大合集爽到抽搐| av在线免费一区| 国产精品卡一卡二| 国产jzjzjz丝袜老师水多| 一区在线免费观看| 一区二区免费在线观看| 欧美日韩国产xxx| 毛毛毛片| 亚洲av成人精品一区二区三区| 91免费版在线看| 亚洲激情一区二区三区| 粗口调教gay2022.com| 午夜影视免费| 九九99视频| 超碰网址| 天天干 夜夜操| 久久福利国产| 国产精品一区二区久久久| 韩国成人理伦片免费播放| 毛片官网| 夜夜夜网站| 久久白丝| 91综合久久| 国产精品水嫩水嫩| 8050午夜二级| 成人首页| bbbbbxxxxx性欧美| 一区二区三区在线视频观看| av导航站| 久操社区| 久久久久久婷婷| 九九热九九| 男人的天堂色琪琪| 国产香蕉视频在线播放| 久久精品国产清自在天天线| 天海翼av电影在线观看| 亚洲成网| 欧美色精品天天在线观看视频| 午夜草逼| 好看的中文字幕电影| 边添小泬边狠狠躁视频| 天天射,天天干| 女生被草| 91伊人网| 久久激情网| av免费在线播放网站| 波多野结衣在线观看一区| 五月激情在线| 国产成人小视频| 在线观看视频99| 99热在线观看免费精品| 亚洲精品一区二区三区四区| 精品人妻无码一区| 黄色动漫在线观看| 久色在线| 铠甲勇士猎铠| 日韩伦理一区二区三区| 性少妇bbw张开| 狂野少女电影在线观看国语版免费| 日韩人妻精品一区二区三区| 日韩黄色一区| av一区三区| 欧美一区二区免费| 天堂网ww| 在线xxxx| 亚洲小说区图片区| 毛片小视频| 久久精品国产亚洲av久一一区| 97人妻精品一区二区三区动漫| 男女高潮网站| 四虎影视最新网址| 亚洲成年人专区| 免费在线黄色网| 黄色国产| 九九国产视频| 成人黄色小说在线观看| 99精品视频播放| 国产一级精品视频| 久久人人艹| jux888本庄优花在线| 久久精品动漫| 久久夜色精品| 福利久久久| 伊人影院视频| 欧美激情网站| 男女精品久久| 天天草天天射| 日韩在线色| 欧美性xxxxx极品| 国产v欧美v日本v精品按摩| 农村脱精光一级| 免费特级黄色片| 91porny丨首页入口在线| 精品不卡一区| 高h破瓜受孕龙精| 超碰999| 看黄色的网站| 国产人妖网站| 激情四射网站| 欧洲色av| 日韩福利视频在线观看| 亚洲妇女无套内射精| 精品九九在线| 成人免费视频国产免费网站| 九九热久久免费视频| av福利网|