国产视频1I欧美高清视频一区二区I国产精品亚洲综合I亚洲第九十九页I国产日韩视频I亚洲色图美腿丝袜I久久综合亚洲精品I亚洲综合天堂I欧美日韩国产伦理I久久久久区I狠狠色hd久久I亚洲性激情I久久伊人影视I国产视频999Iwww.蜜桃avI免费欧美一级视频I成年人性生活免费视频I成人动漫视频I天天搞天天干I久色影视

DEARTO-Professional manufacturer of temperature and humidity measuring instruments
Tai'an Detu Automation Instrument Co., Ltd.

0538-5089056

News Current position:Home > News

Thermal Knowledge | ?Second-class standard platinum resistance thermometers for calibration by the fixed-point method

Release time:2024-6-25    This article is read 4051 Times

Second-class standard platinum resistance thermometers are calibrated by first-class platinum resistance thermometer standard devices using the fixed-point method. The so-called fixed-point method, that is, the thermometer to be examined were placed in the water three-phase point, tin solidification point and zinc solidification point, measuring its resistance value, and then the results of the test and the last cycle of the test results, and then determine whether its stability meets the requirements.


1. The composition of the first-class platinum resistance thermometer standard device

① Standard device: a group of first-class standard platinum resistance thermometer, three, model WZPB-1.

② Calibration equipment: DC comparison ritual temperature bridge, the basic error 1 × 10-6R + 10 △ R (1Ω ≤ R ≤ 1000Ω), model QJ58; water three-phase point bottle and its insulation device; tin point furnace and its temperature control device, metal purity (by weight) of 99.999%; zinc point furnace and its temperature control device, metal purity (by weight) of 99.999%; platinum resistance furnace and its temperature control device. Temperature control device, in the placement of the temperature sensing element in the 100mm range of the axial maximum temperature difference does not exceed 1K.


2. Generation of three fixed points

2.1 Generation of water three-phase point

2.1.1 Water three-phase point

Water three-phase point temperature is a pressure of 610.615Pa in a sealed container, ice, water and saturated steam between the three-phase equilibrium temperature, which defines the value of +0.01 ℃ (273.16K), water, a phase equilibrium diagram shown in Figure 1. three-phase point of the water is not subject to the influence of atmospheric pressure, it is made out of the temperature can be maintained in a few months in the 0.1mK within the same.

圖片 1.png

Fig.1 An equilibrium diagram of water

2.1.2 Generation and preservation of water three-phase points

①Pre-cooling: before freezing, put the bottle of three-phase point in the thermos flask with crushed ice and water to pre-cool overnight, so that its temperature drops to about 1℃.

②Freezing: use cotton dipped in alcohol to scrub the thermometer insertion well of the three-phase point bottle clean, and no water should be left in the well. Repeatedly with cotton dipped in liquid nitrogen in the plug well to pull, so that the plug well around the formation of ice sets. At the beginning of the cotton less, pull the amplitude is small, try to make the bottom of the plug well around the first ice. To be thick enough ice (about 8mm), more cotton, pulling amplitude can be larger, so that the ice layer gradually lengthened, thickened. Ice thickness of 10mm can be. Freezing process should pay special attention to prevent the water three-phase point bottle liquid surface icing. Once the ice can be covered by hand, so that the ice melting.

③ Preservation: The water triple-phase point bottle is placed in a thermos bottle containing ice and water for preservation, the water at the bottom of the bottle is drained every day, crushed ice is added, and the mouth of the bottle is covered with an insulating material.

Water three-phase point bottle frozen after the first few hours, due to the growth of ice crystals or strain within the measured water three-phase point temperature rises faster, about a day and night after stabilization before use.


2.2 Generation of Tin Freezing Point

2.2.1 Metal cooling curve and thermopanel

In order to achieve the solidification point of the metal, the metal is generally first fully melted and then cooled down cooling curve (i.e., temperature and time relationship curve) is shown in Figure 2. which ABD part of the uniform liquid phase cooling process; horizontal part of the EC is the equilibrium phase transition process, at this time the temperature of the material is unchanged, the temperature on the line of the EC is the solidification temperature of the material; EC this period of time is the temperature of the time of the panel: BDE part of the equilibrium phase transition is said to have a supercooling phenomenon before BDE part that in the equilibrium phase transition before the phenomenon of subcooling, once the beginning of a large number of crystallization, the system temperature that is to return to the normal solidification point, the thermopanel appeared; CF part of the crystallization is completed, is a solid-phase cooling process.

圖片 2.png

Fig. 2 Metal cooling curve

2.2.2 Generation of the solidification point of tin

High purity tin solidifies with a large degree of subcooling (up to 20-30°C). In order to obtain a good temperature ping, must use a slow solidification called "external crystallization nucleation" of the induction technology, the specific operation process is as follows:

① Preparation: the tin point furnace and control cabinet connected to confirm the correct wiring; connected to the gas pipe and install a flow meter on top of it; will monitor the thermocouple into the tin point furnace thermometer inserted in the well, the thermocouple connected to the digital multimeter.

② Temperature control: thermostat given the value of 1.005mV, 60-segment programmable temperature controller curve in Figure 3, the actual value of the thermostat is 1.005mV plus a certain moment of the program given the value of the instrument. Figure 4 for the tin point furnace heating curve.

圖片 3.png

Fig.3 Programmable Temperature Controller Curve for Tin Point Furnace

圖片 4.png

Fig.4 Tin spot furnace heating curve

First 60-segment programmable temperature controller to go to the AB section in Figure 3, so that the tin is completely melted, the maximum temperature at the time of melting is about 20K higher than the solidification point of tin. Then 60 programmable temperature controllers go to Figure 3 in the BCD section, the furnace temperature control than the solidification point of tin 2-3K, maintained for 10min, during which the temperature change should not exceed 0.2K. Then 60 programmable temperature controllers go to Figure 3 in the DE section, so that the molten tin at a rate of 0.15K/min temperature reduction. When monitoring the value of the thermocouple down to the tin solidification point near (high 0.1K or so), start blowing nitrogen, nitrogen volume flow rate of about 15L/min. closely observe the value of the thermocouple, when it suddenly stops dropping and quickly back up, immediately stop blowing (blowing time of about 10min), observing the value of the thermocouple, to be back up to the temperature of the solidification point of tin near the thermocouple, remove the thermocouple, and then special stainless steel inducer bar Insert the special stainless steel inducing rod into the well, induced 1min after removal. At this time, the tin solidification point temperature ping appeared, the temperature is 231.928 ℃. Furnace temperature control than the solidification point of low 2K or so. Warm ping time of about 2h.


2.3 Generation of zinc solidification point

① Preparation: the zinc point furnace and control cabinet connected to confirm that the wiring is correct; will monitor the thermocouple into the zinc point furnace thermometer insert wells, thermocouple connected to a digital multimeter.

② Temperature control: thermostat given the value of 2.00mV, 60-segment programmable temperature controller curve in Figure 5, the actual value of the thermostat is 2.00mV plus a certain moment of the program given the value of the instrument.

圖片 5.png

Fig.5 Programmable temperature controller curve for zinc point furnace

First 60-segment programmable temperature controller to go to the AB section in Figure 5, so that the zinc is completely melted, the maximum temperature at the time of melting than the zinc solidification point of about 20K higher. Then 60 programmable temperature controllers go to Figure 5 in the BCD section, the furnace temperature control than the zinc solidification point of 2 ~ 3K, maintained for 10min, during which the temperature change should not exceed 0.2K. Then 60 programmable temperature controllers go to Figure 5 in the DE section, so that the molten zinc at a rate of 0.15K/min temperature reduction. When the monitoring thermocouple value stops falling and begins to rise, remove the thermocouple, the quartz tube induced rod inserted into the plug well, induced 1min and then removed. At this time the zinc solidification point temperature ping appeared. The temperature is 419.527℃, and the furnace temperature is controlled at about 2K lower than the solidification point. The thermopanel time was about 3.5h.


3. The second class standard platinum resistance thermometer checking

3.1 Test principle

Determination principle block diagram in Figure 6.

 

3.2 A second standard platinum resistance thermometer calibration steps

① water three-phase point generation: 24h before the test water three-phase point generation and save.

② Annealing: temperature sensing element for the quartz cross skeleton of the thermometer, the verification should be in the upper limit of the temperature 630 ℃ annealing 2h.

③ Measurement WSn: According to 2.2.2 to establish the tin solidification point temperature ping, measuring the inspected second-class standard platinum resistance thermometer RSn (platinum resistance thermometer into the tin point furnace, should be placed in the annealing furnace before preheating). Measurement of RSn and then put the thermometer indoors to cool down, measure the thermometer Rtp (measurement before the three-phase point of the bottle inside the melt, that is, in the three-phase point of the bottle insert well filled with water slightly higher than 0 ℃, rotate the bottle, so that the ice jacket rotation), the measurement results will be filled into the record table.

④ Measurement of WZn: Establish the zinc solidification point temperature ping according to 2.3, and measure the RZn of the inspected second-class standard platinum resistance thermometer (the platinum resistance thermometer should be placed in the annealing furnace to preheat before it is put into the zinc point furnace). Measure RZn and then put the thermometer in the room to cool down, and then measure the Rtp of the thermometer. fill in the measurement results in the record table.

⑤ Organize the test results: fill in the "second-class standard platinum resistance thermometer comprehensive results of the table", out of the certificate of verification, verification cycle of 2 years.


3.3 Precautions for calibration of a second standard platinum resistance thermometer

3.3.1 Temperature correction

QJ58 DC comparison ceremony temperature bridge measurement, and the bridge supporting the DC standard resistance must be immersed in transformer oil to maintain the resistance of the ambient temperature remains unchanged. QJ58 each time the readings are completed, you must measure the DC standard resistance of the ambient temperature, in order to do the platinum resistance of the measured value of the temperature correction.


3.3.2 Judging the availability of measured values

During the calibration of platinum resistance thermometers, a variety of judgments need to be made about various measurements to determine the availability of the measured values.


3.3.3 Avoiding external influences on the QJ58 bridge

Due to the high sensitivity of the photoelectric amplifiers fitted to the QJ58 bridge, a slight vibration or fluctuation in supply voltage will cause the detector pointer to wobble violently, making it impossible to read and easily damaging the bridge. Therefore, the location of the current detector should not be vibration, to avoid the use of the bridge in the period of supply voltage fluctuations may be large. If the detector pointer is found to be shaking violently or drastically, it should be stopped immediately.


Thermal Knowledge | ?Second-class standard platinum resistance thermometers for calibration by the fixed-point method
  • Online message

  • Your name
    Your title must be filled
  • Cellphone number
    Mobile phone number is required
  • whatsapp/wechat
    Optional
  • Type of consultation
    Required, please select the type of consultation
  • Consultation content
    Required, what is the content you want to consult?
  • Verification code: Please fill in the calculation result.
Previous:News | DEARTO New Invention Patent Certificate and Computer Software Copyright Registration Certificatenext:DEARTO Participates in 2025 Shandong Metrology Committee Annual Meeting: Deepening Metrology for Provincial Development

Contact us

DEARTO QR codeHeadquarter Address Tai'an High-tech Development Zone,  Shandong Province 
Telephon :+86 0538-5089056  +86 13953856217 
Fax : +86 0538-5059718 
After sale:+86 0538-5050959
Website : www.tadt.com.cn 
E-mail   :  tadtzdh@dearto.cn

Copyright? Tai'an Detu Automation Instrument Co., Ltd.             Lu ICP 14024757-1           Business license inquiry

主站蜘蛛池模板: 一级全黄裸体免费观看视频| jzzijzzij亚洲成熟少妇在线观看| 欧美日韩一区不卡| 欧美午夜久久久| 国产乱国产乱300精品| 欧美一级二级片| 免费成人结看片| 夜夜超碰| 在线免费看mv的网站入口| 欧美怡春院| 免费人成在线| 欧美黑人精品一区二区| 欧洲成人在线视频| 人妻精品无码一区二区| 日干夜干天天干| 96超碰在线| 日本不卡高清视频| 天天操天天干天天摸| 韩国av在线免费观看| 狼人综合视频| 91久视频| 国产一级做a爰片在线看免费| 快点啊| 一级片免费网站| 欧美黄视频网站| 91美女福利视频| 关秀媚三级露全乳| 日韩中文字幕在线不卡| 中国老太婆性毛茸茸| 国产第一av| 日日综合| 亚洲少妇网站| 欧美亚洲丝袜| 欧美一区二区不卡视频| 亚洲视频黄色| 亚洲欧洲日本国产| 福利二区| 骚黄网站| 亚洲a资源| 久草青青草| 国产丝袜人妖ts黄檬| 99综合久久| 尤物视频在线播放| 国产女人呻吟高潮抽搐声| 国产高清一区二区三区| 国产精品入口日韩视频大尺度| 自拍99页| 99热只有这里有精品| 大尺度av| 丁香花婷婷| www.jizz欧美| 久久久久久久偷拍| 浪浪视频污| 91刺激| 色先锋资源网| 久久福利片| 黄色激情毛片| 男女羞羞无遮挡| 国产精品免费一区二区三区在线观看| 欧美日韩高清一区| www狠狠操| 99国产精| av片在线观看| 中文字日产幕乱五区| 黄骗免费网站| 拔插拔插华人| 国产3p视频| 中日韩毛片| 美女一区二区三区四区| 午夜一级片| 天天躁日日躁狠狠躁av麻豆男男| 青青操91| 成年丰满熟妇午夜免费视频| 国产精品手机视频| 久久精品国产欧美亚洲人人爽| 懂色av免费看| 三级性生活视频| 亚洲精品 欧美| 亚洲4438| 亚洲天堂2024| 91国产精品一区| 日日拍夜夜拍| 色哟哟中文字幕| 国产白拍| 国产chinesehd精品露脸| 中国女人毛茸茸| 四虎影酷| 国产精品三区在线观看| 在线看视频| 久久只有这里有精品| 中文字幕电影一区二区| 亚洲一区二区三区电影| av桃色| 超碰牛牛| 卡一卡二卡三在线观看| 日本在线观看一区二区| 欧日韩免费视频| 亚洲不卡视频| 日本成人免费视频| 国产片淫乱18一级毛片动态图| 亚洲αv| 国产精品污www在线观看| 国产又色又爽| 国产精品ww| 人妻视频一区二区| 中文字幕欧美人妻精品一区蜜臀| 黑人精品一区二区| 狼性av懂色av禁果av| 欧美在线免费观看| 国内精品卡一卡二卡三| av五十路| 99re国产精品视频| 一区二区三区高清在线观看| 国产精品一区久久| 亚洲成人自拍视频| 麻豆精品免费视频| 高h av| 天天摸天天搞| 国产无限制自拍| 另类二区| 污污的视频网站在线观看| av国语| 国产精品久久久久久无人区| 舔豆豆视频| 伊人老司机| 久久国产精品网站| 欧美极品欧美精品欧美视频| 亚洲精品国产成人无码| 爱的色放 韩国| 人妻无码中文字幕免费视频蜜桃| 国产精品视频福利| 天天综合永久入口| 日韩av一区二区三区在线观看| 久久久资源| 亚欧精品在线| 久久911| 男男做的视频| 91成人免费| 中文字幕精品一区久久久久| 美女高潮黄又色高清视频免费| 久久丫精品忘忧草西安产品| 成肉网| 欧美一区久久| 婷婷夜色福利网| 久久夜夜夜| 久久精品久久99| 91成人国产| 男性影院| 日韩一二三区在线| 伦伦影院午夜理伦片| 色碰视频| 国产偷人| 天堂国产精品| 加勒比在线免费视频| 9191av| 日韩国产欧美综合| 国产情侣91| 操穴影院| 久久久电影| 亚洲欧美自拍一区| 精品999www| av深夜| 日韩精品一级二级| 国产97色在线 | 国产| 开心激情婷婷| 日韩三级视频在线播放| 日本va中文字幕| 天海翼一区二区三区高清在线| 欧美日韩国产影院| 色网站视频| 九九综合| 亚洲综合三区| 亚洲最新av网站| 亚洲无人禁区| 欧美激情在线观看| 国产美女久久| www.欧美在线观看| 中文字幕无码精品亚洲资源网久久| 无码人妻精品一区二区三区蜜桃| www.久久久久.com| 日本黄色一级视频| av在线天堂网| 午夜少妇在线观看视频| 天天爽视频| 国产精品一区二区三区免费看| 一节黄色片| 娇小6一8小毛片| 桃色在线视频| 国产午夜精品一区二区三区嫩草| 国产做爰全过程免费的视频| 米奇影音| 伊人日日夜夜| 在线日韩福利| 国产女主播视频| 全国探花| 五月亚洲婷婷| 天堂网站| 午夜av资源| www.91视频.com| 日本japanese极品少妇| 日韩高清www| 久久综合福利| 影音先锋中文字幕人妻| 亚洲综合在线免费观看| 国产性猛交普通话对白| 久久九九国产精品| 人人涩| 色多多在线观看| 久久久久国产精品无码免费看 | 3d动漫精品啪啪一区二区下载| 日韩视频第一页| 色婷婷社区| 日韩亚洲天堂| 精品一个色| 午夜一级影院| 超碰天天操| 国产91啪| 中国av一级片| 成人动漫h在线观看| 亚洲欧美国产日韩在线观看| 四色永久网站在线观看| 中文字幕a√| 亚洲伦理网| 黑丝美女av| 免费视频日韩| 八戒色| www.九九精品| 99精品视频播放| 国产娇小hdxxxx乱| 国产精品果冻传媒| 999国产精品999久久久久久| 狠狠干亚洲色图| 加勒比视频在线观看| 欧美性猛交xxx乱大交3蜜桃| 成人在线h| 网爆门在线| 中文久久久| 中文字幕啪啪| 日韩福利视频网| 波多野结衣在线播放| 日韩午夜精品| 老熟妇高潮一区二区三区| 色狠av| 国产视频99| 小视频一区| 香蕉在线视频观看| 26uuu欧美日本| 久久久网| 91爱看| 激情五月少妇a| 一级黄色性生活片| 高清在线一区| 毛片国产| 男人的天堂手机在线| 久欧美| 狠狠网| 国产视频h| 在线观看免费黄色av| 欧美日韩理论片| 日韩大片免费在线观看| av一区二区在线观看| 青青草福利视频| 黄网在线观看视频| 国产精品天天干| 免费爱爱网址| 亚洲视频在线一区二区| 亚洲一区二区蜜桃| 97精品国自产拍在线观看| 亚洲爆乳无码精品aaa片蜜桃| 色婷婷av在线| 午夜视频成人| 在线黄网站| 91嫩草影视| 涩涩视频在线| jvid乐乐| 久久只有精品视频| 老熟女毛茸茸| 午夜影院美女| 欧美日韩中文字幕在线| 青青草网站| 国产黄色大全| 鲁一鲁啪一啪| 激情av中文字幕| 中文字幕无线精品亚洲乱码一区 | 日本啪啪片| 国产巨乳在线观看| 美女精品久久| 91九色蝌蚪porny| 69免费| 神马影院午夜伦理片| 亚洲男人天堂网站| 国产中文字幕免费| 少妇高潮av久久久久久| 亚洲国产综合一区| 青青久在线| 黄色特级网站| 大陆一级片| 久久| 91精品久久久久久久久| 超污视频网站| 久久精国产| 色偷偷亚洲| 国产主播中文字幕| 黄色片成人| 精品国产69| 国内精品视频| 免费视频黄在线| 日日干综合| 久久久无码人妻精品一区| 午夜av免费观看| 97精品超碰一区二区三区| 午夜性色福利影院| 日本人妻一区| 国产95在线| 国产乱仑视频| 波多野结衣视频免费| 久久91精品国产91久久yfo| 国产精品久久久久久久9999| 香蕉视频亚洲| 亚洲瑟瑟| 九九午夜影院| 久久精品天堂| 先锋资源一区二区| 久久有精品| 神宫寺奈绪一区二区三区| www视频免费在线观看| av字幕网| av在线播放中文字幕| 麻豆av一区二区| 亚洲国产免费| 久久精热| 色中色综合网| 国产三级小视频| 91精品1区2区| 国产成人免费视频| 国产国语老龄妇女a片| 亚洲第一字幕| 色婷婷综合在线| 91婷婷在线| 精品少妇白浆小泬60P| 天天干天操| 激情瑟瑟| 国产在线观看av| 中出在线视频| 91在线影院| 日韩黄色短片| 刘亦菲国产毛片bd| 韩国三级丰满少妇高潮| 日韩一区二区免费在线观看| 中国毛片基地| 日本97av| 福利逼站| 亚洲美女视频一区二区| 午夜神马福利| 天堂网2021| 午夜影视大全| 欧美射| 锕锕锕锕锕锕锕锕| 一区视频免费观看| 国产美女无遮挡永久免费观看| 91黄色短视频| 蜜桃视频久久| 日韩欧美中文| a级黄色网址| 日韩国产一区二区三区| 日日干夜| 国产在线精| 四虎精品永久在线| 青青草一区二区| 亚洲影院av| 精品一区二区免费| 亚洲一区在线观看视频| 亚洲成av人片一区二区| 中国成人毛片| 经典三级第一页| 黑人巨大精品欧美黑寡妇| 国产精品色网| 91亚洲精品久久久蜜桃| 久草视频资源| 久久久免费观看| 中文字幕亚洲欧美日韩| 尤物视频在线| 热re99久久精品国产99热| 亚洲黄色av| 中文字幕韩国三级理论| 伊人欧美在线| 欧美成人精品一区| 中文字幕乱码在线| 中文字幕二区| 逼逼av| 啪啪福利社| 国产极品视频在线观看| 熟妇人妻久久中文字幕| 日日夜夜欧美| 国精产品一区一区三区mba下载| 午夜小视频网站| 国产精品一二| 国产精品亚洲二区| 亚洲色图 在线视频| av在线播放亚洲| 国产一区二区三区伦理| 日本黄色动态图| 精品在线一区二区三区| 高潮抽搐在线观看| 免费观看大片视频| 日韩女优av在线| 亚洲精品国产a| www.99热| 男女乱淫| 国产毛片在线视频| 九九久久国产| 亚洲精品观看| 激情小视频| 日本免费在线播放| 午夜精品久久久久久久久久久久久久| 中文字幕1页| 国模丫头1000人体| 国产精品乱码| 欧美成人综合| 国产又粗又猛又色又| 欧美日韩一区二区在线播放| 国产九九热视频| 狠狠狠干| 日韩不卡一区| 亚洲第一黄色网| 婷婷一区二区三区| 人人妻人人澡人人爽精品日本| 国产美女极度色诱视频www| 秋霞影院一区二区三区| 香蕉久久久| 国产欧美精品区一区二区三区| 日本免费看| 午夜影院啊啊啊| 成人免费黄色网址| 日本黄色片| 欧美香蕉视频| 亚洲狼人在线| 欧美深夜视频| 日b影院| 免费人成年激情视频在线观看| 亚洲理论影院| 国产视频在线观看免费| 亚洲jizzjizz| 成人免费看片视频| 伊人久综合| 伊人网成人| 夜夜嗨av禁果av粉嫩av懂色av| 免费看的av网站| 日韩操操操| 人人超碰97| 亚洲精品视频在线免费| 亚洲午夜av在线| 亚洲天堂av在线播放| 在线日韩一区二区| 涩涩视频免费看| 9l视频自拍九色9l视频最新| 男生和女生一起差差差视频| 欧洲亚洲国产精品| 国产黄站| 亚洲国产一区二区在线观看| 91在线不卡| 欧美性猛交ⅹxx| 暗呦丨小u女国产精品| 95看片淫黄大片一级| 久久精品99北条麻妃| 欧美色无极| av在线亚洲天堂| 亚洲精品视频网址| 久久久电影| 少妇把腿扒开让我添69式漫画 | 岛国av在线看| 久久亚洲成人av| www.av麻豆| 亚洲综合影视| 欧美亚洲视频| 欧美高清处破的免费视频| av亚洲在线| 人人天天夜夜| 99成人精品视频| 欧美日韩成人在线观看| a成人在线| 天堂av中文在线观看| 日本深夜福利| 亚洲天堂av影院| 欧美性开放视频| 尤物一区二区| 人妻少妇一区二区三区| 欧美色婷婷| 一区二区三区国产免费| 又色又爽又黄| 91成人免费网站| 免费国产a级片| 日韩av导航| 色综合天天| 福利视频在线免费观看| 日本污视频在线观看| 青青草网址| 久久久久不卡| 日韩精品视频免费| 特黄色大片|